NEWS

17.10.2019

New plant of Quick Load S.r.l.

Since 01/06/2019 Quick Load moved to via Fornace 20, a few meters from the previous site, always in Castel Guelfo di Bologna. The move was necessary because of the constant growth of the Company in these last years, which led to the need to significantly expand our Workshop for the assembly and testing of increasingly complex robotic cells. We also have a larger area dedicated to our offices, with correctly sized spaces where we can exchange ideas and receive our Customers.

Visit our YouTube channel